1. | Project Location | |
| Province | Koshi |
| District | Morang |
| Project Site | Ward-04, Budhiganga Rural Municipality |
| Geographical Co-ordinated | |
| Latitude | 26° 33′ 04″ N to 26° 33′ 18″ N |
| Longitude | 87° 17′ 27″ E to 87° 17′ 40″ E |
2. | General | |
| Average Annual Insolation Data | 5.89 KWh/m2/day |
| Average Annual Temperature | 24.3°C |
| Humidity | 55%-90% |
| Annual Average Wind Speed | 2.8 m/s |
| Installed Capacity | 6800 KW |
| Contract Energy | 13176000 KWH |
3. | Generation | |
| Rated Output Capacity per Panel | 540Wp & 545Wp (10116 & 4932 nos) |
| Area of Each Panel | 2.61 m2 |
| Total Area of Panel | 39318 m2 |
| Voltage (DC) per string | Max 1500 V |
| Module Efficiency | 20.7%&20.9% |
4. | Inverter | |
| Capacity of each Inverter | 4715KVA&2230kVA |
| Number of Units | 2 Nos. |
| Rated output voltage | 690V |
| Power Factor | From 0 to 1 Inductive or Capacitive |
| Frequency | 50 Hz |
| Total harmonic Distortion | Less than 3% |
| DC current Injection | Less than 0.5% of full rate output at the inter-connection point or (equal to or less than) 5mA |
| Efficiency | 98.80% |
5. | Transformer | |
| Type | Outdoor, Three Phase, ONAN, Inverter Duty Transformer |
| Rate Capacity | 5 MVA&2.5 MVA |
| Voltage Ratio | 690/33,000V |
| Number of Transformer | Two |
| Vector Group | YNd11 |
| Efficiency | 98.75% at 75% loading |
6. | Transmission Line | |
| Voltage Level | 33kV |
| Length | 3.2 KM |
| From | Project Site |
| To | Multifuel Substation |