PV Solar (10 MV) – Jhapa

Project Summary

One Company should appoint for conducting a detailed feasibility study and preparing a detailed project report for setting up a 10 MW solar power plant in Gaurada, Jhapa District, Nepal and promotor company has to obtain a license approval from Department of Electricity Development to conduct detailed feasibility study.

  1. Salient Feature:
    Location District: Jhapa, Gauradah-9 (15 Km south from damak)
    Geographical Location: 27⁰33’17.73″N, 88⁰17’37.79″E Altitude: 887 m
    Nearest Major Town: Gauradah, Jhapa
    Nearest Airport: Biratnagar & Bhadrapur ( Almost same distance 90 KM)
    Nearest Substation: Juropani Substation ( About 4 KM distance)
    Accessibility: By South-North Highway (Damak to Gaurigang) and 7 km gravel road up to size.
    Land Availability Land Area: 100, 500 m2 of vacant or plain area.
  2. Meteorological Data and Solar Resources:
    Average Global Horizontal Irradiation = 4 kwh/m2/day
    Average Global Tilted Irradiation = 4.5 kwh/m2/day
    Average sun hours/day = 4.5 hours
  3. System Design:
    Grid Connected Power Plant
    DC Capacity: 10 MWp
    AC Capacity: 9MW
  4. System Configuration:
    Nominal Capacity = 10 MW
    Modules = Mono crystalline modules; Long /TRINA of capacity 650Wp.
    Inverters = Two 5000KW and one 2500KW centralized inverter
    Mounting = Fixed Mounting Structure facing south with tilt angle of 21 degree;
    Cables = LT power Cable, multi-core, stranded aluminum conductor.
  5. Power Evacuation System:
    33 KV O/H line
    33 KV Supply Substation of jurooani, 5 Km far from power plant
    33KV, 13m PSC pole
  6. Energy Generation Annual Average Energy Output:
    15000.00 MWh/year
    Performance Ratio: 78%
    Capacity Utilization Factor: 15.8%
    APPENDEX: Layout and drawing

Project Gallery

Project Information
Category:
PV Solar
Capacity:
10W
Address:
Gauradha-9, Jhapa